steps on How to do New floor screeding

for a new cement/sand floor screeding, its better for the floor if the mix ratio can be 1:4, 1 part cement to 4 parts sand.  if you are not planing to put over load goods or things there is no need for reinforcement, the thickness of the screeding slab can be 50mm or 2 inch thick.
Step 1; do floor blending with a good earth compactor.

Step 2; Using a tube level, bench mark every 2m or 6 feets so that the whole floor is even

Step 3; if your not using a pipe, use the mixed cement and make a trench with a ruler section

 now that there are two side with same height as the above pic, and center is with no cement mix.
Step 4; pour the cement mortar and spread it and using a trowel you can fine smooth it.

Source; www.yd-mv.com

Friday, August 17, 2012

How to put up a wood partition

25x15 feet Space to be divided into two rooms, rooms with 8 feet high timber partition with two panel doors to each room.


Step 1. Mark two point on both side of the rooms where you want the room to be divided, than draw a line on the floor, after you know your line, place solid timber of 2x1.5 inch on the line than screw to the floor, 3 feet apart, so that it securely anchors to the floor. 

Step 2. Erect timber each 2 feet apart to a height of 8 feet, than place the top timber so that the frame is now completed, add reinforcing timber in between each erected timber at a height of 4 feet.

 Step 3. Nail the 3mm ply wood with 1inch nail, hammer the nails 6inch apart on the sides, and for the center spaces, 1 feet part.



 Step 4. Fix the door frames the partition frames.





Step 5. Fix the panel door and insert lock.


Friday, August 10, 2012

Factors effects Divers while Underwater Concrete




1. Effect of tidal flow
The most important limiting factor which adversely affects a diver's work is the velocity of water flow. A flow of 1 knot has roughly the same effect on a diver as that of an 80 km/h wind acting on a man on land. The maximum tidal flow in which a diver can work effectively is, not surprisingly, about "1 knot. The ability to work in a strong tidal flow is dependent on the work task, the work location and adjacent physical support available to the diver.

2. Visual inspection

A diver looking, as he does, through layers of air, glass and water observes objects apparently larger and closer than they actually are. He is therefore liable to report incorrect dimen-sions if he relies solely on observation, and he should always use a sea-bed ruler. A spirit-level may be used to establish levels in shallow water.


3.Poor visibility
In rivers which run through highly populated or industrialized areas, visibility is often very poor. The converse usually applies in sparsely populated areas. Similarly, in coastal areas near river estuaries, the outflow of polluted rivers may adversely affect visibility many miles offshore although the prospect of good visibility improves further offshore. Apart from pollution caused by man, sand from the sea-bed brought into suspension by storms can reduce visibility to a few centimeters even well offshore. After a few days of good weather this can change to give a visibility in excess of 30m. In poor visibility, high- candlepower lights illuminate only the particles in suspension so the diver sees myriads of bright reflections from the particles. Special low-candlepower lights are available for close inspection in poor visibility. In areas of permanent low visibility, tactile measuring devices are invaluable and the diver's fingers become his eyes.

Underwater floodlights are likely to be useless in shallow water where daylight has not penetrated. The effective use of floodlights is primarily limited to night work or at intakes and other areas where natural light cannot penetrate.


4. The underwater season
In the summer months, weeds and other marine growth are at their most prolific, particularly in shallow coastal waters. Inspection of outfalls and other structures is therefore best carried out in the early spring.

5. Fatigue
Breathing underwater involves appreciable effort. The muscles of the rib cage which draw air into the lungs have to work harder to ventilate the lungs with the denser air. With the demand-valve systems, some effort is also required to activate the tilt valve. The effort required to swim underwater is heavy and trials have shown that a diver in standard diving apparatus uses approximately the same effort when walking as the under- water swimmer. Two hours is considered the maximum time a diver can work efficiently using a demand-valve breathing system. Provided that he is working in one area, 4 h duration is possible in helmet gear.


6.Sickness
Of necessity, divers are required to have a high degree of physical fitness and, generally, they are very rarely ill. However, working in cold water and experiencing temperature changes exposes them to the common cold. This can be serious since the presence of mucus in the Eustachian tubes can prevent 'clearing his ears'. He is then unable to balance the pressure across his ear drums and the drums are forced inwards. The forcing can cause damage or infection of the ear. Consequently, divers should not dive with a head cold.





Sunday, July 29, 2012

How to do toilet floor

Top of the slab
 Courtesy of YD Works
Toilet to be constructed on top of a slab with dimension 4 feet x 5 feet, so for this job, there is a 4inch dia UPVC Pipe drilled in to the slab, make sure you have the correct gap between the wall the pipe.

Bench marked for floor screeding
Courtesy of YD Works
Point "A" is the floor drain after drilling hole of 2inch with a pipe fitted, than find the top level of drain and find the top level of "B", make sure the levels differs by 12mm, so that it creates a slop. "C" is where WC is to be fitted.

Floor screeding completed
courtesy of YD Works
ones the floor screeding is completed, now that there is a slop of 12mm from one end to the drain, now that its ready for tiles work

floor tiles completed

Wall Tiles completed
after the tiles is completed, fill the gaps with white water resisting cement. after all the caps been filled, fit the WC on top of the pipe and secure the WC with sealant.

Wednesday, July 25, 2012

How to fabricate a steel door

First cut the pipes to the desired size. Then place the pipes on a flat surface, give each joint a tech weld while placing the pieces.
Once all the welds r completed, start butt welding it joint by joint. Apply red oxide paint once grinding is done. Then fix the wheels. And fit it on the frame.