The installation process and method of installations are equally important factors as of the design process of pile foundations. In this section we will discuss the two main types of pile installation methods; installation by pile hammer and boring by mechanical auger. 

In order to avoid damages to the piles, during design, installation Methods and installation equipment should be carefully selected. If installation is to be carried out using pile-hammer, then the following factors.

should be taken in to consideration: 
  • the size and the weight of the pile 
  • the driving resistance which has to be overcome to achieve the design penetration 
  • the available space and head room on the site 
  • the availability of cranes and 
  • the noise restrictions which may be in force in the locality. 

Pile driving methods (displacement piles)
Methods of pile driving can be categorised as follows:
  1. Dropping weight
  2. Explosion
  3. Vibration
  4. Jacking (restricted to micro-pilling)
  5. Jetting 


Drop hammers 
A hammer with approximately the weight of the pile is raised a suitable height in a guide and released to strike the pile head. This is a simple form of hammer used in conjunction with light frames and test piling, where it may be uneconomical to bring a steam boiler or compressor on to a site to drive very limited number of piles.
 
There are two main types of drop hammers:  
  1. Single-acting steam or compressed-air hammers; comprise a massive weight in the form of a cylinder. Steam or compressed air admitted to the cylinder raises it up the fixed piston rod. At the top of the stroke, or at a lesser height which can be controlled by the operator, the steam is cut off and the cylinder falls freely on the pile helmet. 
  2. Double-acting pile hammers; can be driven by steam or compressed air. A pilling frame is not required with this type of hammer which can be attached to the top of the pile by leg-guides, the pile being guided by a timber framework. When used with a pile frame, back guides are bolted to the hammer to engage with leaders, and only short leg-guides are used to prevent the hammer from moving relatively to the top of the pile. Double-acting hammers are used mainly for sheet pile driving. 





Diesel hammers 
Also classified as single and double-acting, in operation, the diesel hammer employs a ram which is raised by explosion at the base of a cylinder. Alternatively, in the case of double-acting diesel hammer, a vacuum is created in a separate annular chamber as the ram moves upward, and assists in the return of the ram, almost doubling the output of the hammer over the single-acting type. In favourable ground conditions, the diesel hammer provide an efficient pile driving capacity, but they are not effective for all types of ground. 

Pile driving by vibrating
Vibratory hammers are usually electrically powered or hydraulically powered and consists of contra-rotating eccentric masses within a housing attaching to the pile head. The amplitude of the vibration is sufficient to break down the skin friction on the sides of the pile. Vibratory methods are best suited to sandy or
gravelly soil.

Jetting: to aid the penetration of piles in to sand or sandy gravel, water jetting may be employed. However, the method has very limited effect in firm to stiff clays or any soil containing much coarse gravel, cobbles, or boulders.
complete vibration hammer kit, just need a heavy excavator to attach the hammer


Boring methods ( non-displacement piles) 

Continuous Flight Auger (CFA) 
An equipment comprises of a mobile base carrier fitted with a hollow-stemmed flight auger which is rotated into the ground to required depth of pilling. To form  the pile, concrete is placed through the flight auger as it is withdrawn from the ground. The auger is fitted with protective cap on the outlet at the base of the central tube and is rotated into the ground by the top mounted rotary hydraulic motor which runs on a carrier attached to the mast. On reaching the required depth, highly workable concrete is pumped through the hollow stem of the auger, and under the pressure of the concrete the protective cap is detached. While rotating the auger in the same direction as during the boring stage, the spoil is expelled vertically as the auger is withdrawn and the pile is formed by filling with concrete.In this process, it is important that rotation of the auger and flow of concrete is matched that collapse of sides of the hole above concrete on lower flight of auger is avoided. This may lead to voids in filled with soil in concrete. 

The method is especially effective on soft ground and enables to install a variety of bored piles of various diameters that are able to penetrate a multitude of soil conditions. Still, for successful operation of rotary auger the soil must be reasonably free of tree roots, cobbles, and boulders, and it must be self-supporting.

During operation little soil is brought upwards by the auger that lateral stresses is maintained in the soil and voiding or excessive loosening of the soil minimise. However, if the rotation of the auger and the advance of the auger is not matched, resulting in removal of soil during drilling-possibly leading to collapse of the side of the hole. 



Underreaming 
A special feature of auger bored piles which is sometimes used to enable to exploit the bearing capacity of suitable strata by providing an enlarged base. The soil has to be capable of standing open unsupported to employ this technique. Stiff and to hard clays, such as the London clay, are ideal. In its closed position, the underreaming tool is fitted inside the straight section of a pile shaft, and then expanded at the bottom of the pile to produce the underream Normally, after installation and before concrete is casted, a man carrying cage is lowered and the shaft and the underream of the pile is inspected. 


C.H.D.P 
Continuous helical displacement piles: a short, hollow tapered steel former complete with a larger diameter helical flange, the bullet head is fixed to a hallow drill pipe which is connected to a high torque rotary head running up and down the mast of a special rig. A hollow cylindrical steel shaft sealed at the 
lower end by a one-way valve and fitted with triangular steel fins is pressed into the ground by a hydraulic ram. There are no vibrations. Displaced soil is compacted in front and around the shaft. Once it reaches the a suitably resistant stratum the shaft is rotated. The triangular fins either side of its leading edge carve out a conical base cavity. At the same time concrete is pumped down the centre of the shat and through the one-way valve. Rotation of the fins is calculated so that as soil is pushed away from the pile base it is simultaneously replaced by in-flowing concrete. Rates of push, rotation and concrete injection are all controlled by an onboard computer. Torque on the shaft is also measured by the computer. When torque levels reach a constant low value the base in formed. The inventors claim that the system can install typical pile in 12 minute. A typical 6m long pile with an 800mm diameter base and 350mm shaft founded on moderately dense gravel beneath soft overlaying soils can achieve an ultimate capacity of over 200t. The pile is suitable for embankments, hard standing supports and floor slabs, where you have a soft silty layer over a gravel strata.



you may also like to check out;

2 comments:

  1. Dear sir wee need this machine wow we can buy this please let mee know jocc.kabul@gmail.com

    ReplyDelete
  2. We are the one of the best Piling Holsworthy. Our company provides you the best piling foundation services.

    ReplyDelete